Curtain Wall Installation Process of Shenyang Glass Curtain Wall Engineering Company

Curtain Wall Installation Process of Shenyang Glass Curtain Wall Engineering Company

2025-06-20 17:34

The curtain wall installation process of Shenyang Glass Curtain Wall Engineering Company usually includes design review, material preparation, on-site investigation, main structure treatment, frame installation, glass installation, sealing and closing treatment, quality acceptance and commissioning, and later maintenance. The following is a detailed introduction:




Design review: Conduct a detailed review of the curtain wall design drawings before installation to ensure compliance with building codes and safety standards.


Material preparation: Prepare glass, metal frames, sealing materials, etc. according to design requirements to ensure that material quality meets standards.


On site investigation: Conduct on-site inspections of installation sites, evaluate construction conditions, and develop construction plans.


Main structure processing:


Reinforcement: Ensure that the wall structure can withstand the weight of the curtain wall and wind force.


Installation of pre embedded parts: Metal parts are pre embedded on the wall according to design requirements for fixing the curtain wall.


Framework installation:


Assembly: Assemble the metal frame on site to ensure accurate dimensions and secure connections.


Fixed: Connect the assembled frame to the embedded parts and adjust the verticality and levelness.


Glass installation:


Processing: Cutting, grinding, coating and other processing of glass according to design requirements.


Installation: Install the processed glass into the frame, paying attention to the installation sequence and sealing performance.


Sealing and sealing treatment:


Sealing treatment: Seal the joints of the curtain wall to prevent water vapor and dust from entering.


Closing treatment: Treat the closing part of the curtain wall to ensure aesthetics and functionality.


Quality acceptance and debugging:


Quality acceptance: Conduct quality acceptance on the installed curtain wall, including dimensions, verticality, levelness, sealing, etc.


System debugging: Debugging the drainage, ventilation and other systems of the curtain wall to ensure normal operation.


Post maintenance:


Regular inspection: Conduct regular inspections of the curtain wall and promptly address any issues found.


Maintenance: Clean and maintain the curtain wall according to the regulations.


Hotline:
024-62615555
Contact Address:
No. 126, Shenbei Road, Shenbei New District, Shenyang City
Working Hours:
Monday to Friday, 09:00-18:00
service qrcode
Scan to Follow
service qrcode
Scan to Follow
  • Name*

  • Remarks*